Last checked October 21, 2026. Details change; confirm with the source before you go.
Lake Murray is a Dominion Energy reservoir, and shoreline structures need a Dominion permit. Dominion says all guidelines in its Shoreline Management Plan and Permitting Handbook must be met, and that meeting them still doesn't guarantee approval.
Permit fees
| Item | Fee |
|---|---|
| Dock | $250.00 |
| Dock modification | $100.00 |
| Boat lift | $100.00 |
| Boat ramp (concrete) | $100.00 |
| Marine rails | $100.00 |
| Retaining wall | $100.00 |
| Rip rap | $50.00 |
| Limited brushing | $100.00 |
| Dredging/excavation | $700.00 ($200 + $500 refundable deposit) |
| Dock violations | Removal cost + $1,000 enforcement fee |
Where to apply
Dominion's fee schedule points to applications at DominionEnergySC.com (About Us, Lakes and Recreation) and lists 803-217-9221 or 1-800-251-7234.
Need a builder?
Planning a dock, lift or seawall? Request quotes from local pros.
FAQ
How much is a dock permit on Lake Murray?
Dominion Energy's Lake Murray fee schedule lists the dock permit fee at $250.00.
Do I need a permit for a boat lift?
Yes. The fee schedule lists a $100.00 boat lift fee.
Does paying the fee guarantee approval?
No. Dominion notes that all permitting guidelines must be met and payment does not guarantee an approved permit.